Each type of meter vault frame and cover.
3 water meter vault.
City of durham 3 water meter vault overview precast meter boxes and vaults also referred to as valve boxes protect and provide easy access to water meters.
Submit design calculations and shop drawings for precast vault elements.
Copeland precast was born in 1935 when ed copeland sr.
W 31 typical 1 2 water meter box installation w 32 typical 4 water meter vault w 33 typical 6 thru 10 water meter vault w 34 fire domestic irrigation options schematic w 35 irrigation tap on new and existing services w 35t termination of irrigation meter w 36 reduced pressure backflow preventer w 37 typical fire main double detector check valve assembly w 38 standard double check.
Assembly includes all the parts you need to install 5 8 x 3 4 water meters plus a standard locking lid and stabilizing ribs on the upper section non locking lid optional.
Available call for availablility mag 5106 water vault 4 water meter 5 0 x 10 6 x 5 0.
6 turbine water meter vault.
Submit manufacturers product data for following items for approval.
Ez vault cold warm 30 60.
Section s920 water meter vault 3 inch to 10 inch domestic meters s920 1 description.
Mag 4686 water vault 3 water meter 4 6 x 8 6 x 5 0 download pdf.
Installation of a water meter exceeding 2 inch will require city engineer approval.
4 turbine water meter vault.
Each type of meter box and cover.
Started building small precast items in his denver backyard.
Oldcastle infrastructure s meter boxes and vaults also referred to as valve boxes protect and provide easy access to water meters.
3 turbine water meter vault.
5 8 x 3 4 water meter copper setter inside concrete vault j.
The two sections can be bolted together or left unbolted to allow the parts to shift preventing.
The meter and vault will require a flowrate and demand analysis by the developer builder and a site specific design.
Conform to requirements of section 01 33 00 submittals.
Oldcastle infrastructure concrete meter vaults provide superior durability and are the ideal heavy duty solution for commercial and industrial applications as well as residential.
A lip on the box s upper section extends over the edges of the lower section.
Water meter size shall be approved by the city engineer prior to installation of any service line meter vault or water main tap.
Work consists of the construction of a new water meter vault complete with all appurtenances as required in the contract documents and as directed by the project manager.
Work is to be in conformance with the requirements of section s900 general water provisions.
Today copeland precast is owned and operated by bart and brooke copeland.
Each type of valve box and lid.